          Project Feasibility Stage

 

The feasibility stage includes identification of the investment opportunity in a specific country and the formulation of a strategy for project development. Economic and technical analysis of the region is done to certify the financial model as well as to verify the legal and regulatory framework for renewable energy projects.  This assessment determines whether to proceed further with the project and commit additional financial resources.

 

  • Land availability

  • Conceptual design

  • Financial modelling

  • Estimated energy yield

  • 30-35 years forecast of electricity prices

  • Grid connection cost and time to connection

  • Identification of an potential environmental or social  “deal-breakers”

  • Permitting requirements, cots and feasibility of achieving consent

  • Assessment of the current regulatory environment

  • An initial concept of the project’s legal/corporate structure; up to development and ownership of the specific project or portfolio

  • Preliminary timeline for the project 

 

          Site Identification

 

  • Selecting land in proximity to the selected point of connection.

  • Securing a purchase or a long-term lease over the land for the construction of the solar power plant

 

 

           Permit and Grid Connection

 

At the point the exclusivity agreements are signed with the landowners and the grid companies confirm there is available capacity to connect the plant EEW starts working on getting all required planning permits. The specific process varies from country to country but the main points are outlined below:

 

  • Detailed review and inventory of all necessary permits and licenses needed for constructing and operating the power plant. Examples are environmental permits; land use permits and generator licenses.

  • Pre-application discussions with the relevant planning authority about schedule for permitting, to understand the financial implications.

  • Preparation and submission of relevant permit and licence applications.

  • Preparation and submission of grid connection application.

 

          EPC Agreement

 

EEW has extensive experience in finding the best suitable contractor for the construction of the plant. Proper EPC contracts will be signed that will include responsibilities for the contractor such as prepare a detailed engineering design of the project, procure all equipment and materials necessary, and then construct and commission the plant to the client respecting specific timelines.

 

          Financing

 

EEW’s responsibilities include arrangement of senior debt, construction finance, equity investment. In order to obtain finance, we prepare comprehensive documentation of the project that enable reliable revenue projections that the banks and investors will be comfortable with. The appropriate structure that will be used will be influenced by the commercial and financial needs of the investors and finance available.

 

          Commissioning and Operations

 

EEW is responsible for arranging long term operation and maintenance of the plant. Compared to other power generating technologies, Solar PV has low maintenance and servicing requirements. However, a proper maintenance of a PV plant is essential to maximize both energy yield and the plant’s useful life. EEW commits to deliver optimal operations to strike a balance between maximizing production and minimal cost.

Development Solar Power Plants

Screen Shot 2019-04-03 at 15.11.31.png

Project Feasibility

Screen Shot 2019-04-03 at 15.11.41.png

Site Identification

Screen Shot 2019-04-03 at 15.11.52.png

Permits and Grid Connection

Screen Shot 2019-04-03 at 15.12.00.png

EPC

Agreement

Screen Shot 2019-04-03 at 15.12.09.png

Financing

Screen Shot 2019-04-03 at 15.12.30.png

Commissioning and Operations